Subsea 7 SA Other Non-Current Liabilities 2010-2024 | SUBCY
Subsea 7 SA other non-current liabilities from 2010 to 2024. Other non-current liabilities can be defined as field containing the sum of all non-current liabilities that cannot be standardized into another field as well as those that are aggregated by the company because materially, they are too small to list separately.
- Subsea 7 SA other non-current liabilities for the quarter ending March 31, 2024 were $0.056B, a 34.35% decline year-over-year.
- Subsea 7 SA other non-current liabilities for 2023 were $0.059B, a 28.38% decline from 2022.
- Subsea 7 SA other non-current liabilities for 2022 were $0.082B, a 19.75% decline from 2021.
- Subsea 7 SA other non-current liabilities for 2021 were $0.102B, a 12.05% increase from 2020.
Subsea 7 SA Annual Other Non-Current Liabilities (Millions of US $) |
2023 |
$59 |
2022 |
$82 |
2021 |
$102 |
2020 |
$91 |
2019 |
$86 |
2018 |
$142 |
2017 |
$126 |
2016 |
$133 |
2015 |
$134 |
2014 |
$145 |
2013 |
$89 |
2012 |
$105 |
2011 |
$129 |
2010 |
$60 |
2010 |
$ |
2009 |
$47 |
2009 |
$ |
Subsea 7 SA Quarterly Other Non-Current Liabilities (Millions of US $) |
2024-03-31 |
$56 |
2023-12-31 |
$59 |
2023-09-30 |
$60 |
2023-06-30 |
$99 |
2023-03-31 |
$85 |
2022-12-31 |
$82 |
2022-09-30 |
$110 |
2022-06-30 |
$98 |
2022-03-31 |
$94 |
2021-12-31 |
$102 |
2021-09-30 |
$65 |
2021-06-30 |
$78 |
2021-03-31 |
$80 |
2020-12-31 |
$91 |
2020-09-30 |
$89 |
2020-06-30 |
$90 |
2020-03-31 |
$77 |
2019-12-31 |
$86 |
2019-09-30 |
$100 |
2019-06-30 |
$135 |
2019-03-31 |
$137 |
2018-12-31 |
$142 |
2018-09-30 |
$149 |
2018-06-30 |
$163 |
2018-03-31 |
$137 |
2017-12-31 |
$126 |
2017-09-30 |
$128 |
2017-06-30 |
$134 |
2017-03-31 |
$150 |
2016-12-31 |
$133 |
2016-09-30 |
$135 |
2016-06-30 |
$110 |
2016-03-31 |
$110 |
2015-12-31 |
$134 |
2015-09-30 |
$166 |
2015-06-30 |
$154 |
2015-03-31 |
$151 |
2014-12-31 |
$166 |
2014-09-30 |
$97 |
2014-06-30 |
$94 |
2014-03-31 |
$86 |
2013-12-31 |
$89 |
2013-09-30 |
$88 |
2013-06-30 |
$83 |
2013-03-31 |
$84 |
2012-12-31 |
$105 |
2012-09-30 |
$118 |
2012-06-30 |
$120 |
2012-03-31 |
$127 |
2011-12-31 |
$129 |
2011-09-30 |
|
2011-06-30 |
|
2010-12-31 |
$60 |
2010-09-30 |
$76 |
2010-06-30 |
$61 |
2010-03-31 |
$51 |
2009-12-31 |
$47 |
2009-09-30 |
$45 |
2009-06-30 |
$54 |
2009-03-31 |
$90 |
Sector |
Industry |
Market Cap |
Revenue |
Oils/Energy |
Oil & Gas - Field Services |
$5.028B |
$5.974B |
Subsea 7 S.A., formerly known as Acergy S.A., operates as an engineering, construction and services contractor to the offshore energy industry worldwide. The Company is engaged in the design, fabrication, installation and commissioning of seabed-to-surface projects and its scope of operations include Subsea, Umbilical, Riser and Flowline (SURF) systems; Life-of-Field; Conventional Services and Renewables. Services offered by the Company ranges from engineering and construction for subsea field developments, pipeline and riser systems and associated services, inspection, maintenance and repair, integrity management and remote intervention, fabrication and installation of fixed platforms and associated pipelines, as well as hook-up and platform refurbishment. Subsea 7 S.A. is based in London, United Kingdom.
|